Transparent Pricing - No hidden Fees
Enterprise · Commercial Relocation Services

We engineer outcomes.
Not just moves.

An enterprise commercial relocation program built for projects where execution risk has real cost: occupied renovations, capital improvements, and multi-site repositioning across multifamily, healthcare, senior living, and corporate real estate in Texas. We integrate into your construction schedule, compliance framework, and reporting cadence as a single accountable partner.

A short Project Velocity Walkthrough™, not a pitch. We review scope and compliance fit before scheduling anything further.

1
Supervisor on every job. One point of accountability.
40yrs
Family-operated Texas relocation since 1985.
5
One framework, end to end: Plan · Execute · Store · Return · Report.
hero photo — crew loading commercial property
98%
of supervisor-led jobs close on or ahead of schedule
Positioning

You shouldn’t have to manage a moving company.

Relocation typically enters a project late, sits parallel to construction, and absorbs schedule slippage from every other trade. Our model integrates it as a controlled phase, planned against the build, supervised on site, and documented to closeout.

01 / The shift

Most movers react. We engineer.

When relocation isn’t planned like the rest of your project, timelines slip, teams scramble, and residents feel it. We integrate before the first box is packed. Supervisor-led, scheduled against your build plan.

02 / The frame

Projects don’t break from construction. They break from coordination.

Too many vendors, missed handoffs, no visibility, constant follow-ups. We replace that with one accountable system: one point of contact, one process, one set of metrics.

03 / The outcome

From cost center to contributor.

We protect the financial integrity of the project, lock our system into your construction schedule, and the result is fewer claims, faster execution, and a smoother experience downstream.

The program

Perfect Move
by Design™

A five-pillar relocation program designed against your construction schedule. Each pillar is supervised, documented, and handed off with a defined deliverable, so progress is measurable and accountability sits in one place.

Pillar 01

Plan

Align before anything moves.

We walk the project and surface every variable that can become friction: sequencing, access, resident or tenant impact, compliance, and storage. All of it before crews arrive.

  • Stakeholder alignment & scope review
  • Schedule development & risk mapping
  • Communication plan
Pillar 02

Execute

One supervisor. One point of accountability.

Trained crews run the plan under a dedicated on-site supervisor who owns the outcome, not a dispatched team measured on truck utilization.

  • Supervisor-led, scheduled against the build
  • Quality control & issue resolution
  • Single point of contact
Pillar 03

Store

Stored once. Handled twice. Documented throughout.

Assets move into 3 Men Movers Portable Storage™ with supervisor-led loading and a true two-touch chain of custody. Packed once, stored securely, delivered once.

  • 3 Men Movers Portable Storage™
  • Documented chain of custody
  • Climate-controlled, inventory-tracked
Pillar 04

Return

Back to normal, on schedule.

We complete the transition: move-backs, FF&E placement, and resident or staff returns. Then we close the project cleanly.

  • Move-backs & reoccupancy
  • FF&E placement & installation support
  • Project closeout
Pillar 05

Report

Leadership sees status without chasing it.

Every phase is tracked unit by unit in TurnTrack™: live status, photos, timestamps, and audit-ready closeout. Nothing to chase.

  • Live, unit-by-unit status in TurnTrack™
  • Photo & timestamp documentation
  • Audit-ready closeout records
Verticals

One operator.
Four verticals, one standard.

We concentrate enterprise capacity where compliance, supervision, and repeatable execution create the most measurable impact. Each vertical has dedicated supervisor teams and a proven playbook, held to the same standard.

Multifamily Redevelopment

Occupied renovation, managed in place.

Occupied renovations, capital improvements, and resyndication projects. Relocations run around residents and the construction schedule, not against them.

  • Occupied & in-place renovations
  • Resident relocation programs
  • LIHTC / RAD / HUD experience

Healthcare

Transitions around clinical operations.

Department relocations, facility upgrades, and equipment transitions, executed in phases with minimal disruption to care.

  • Hospital & clinic relocations
  • Equipment & FF&E transitions
  • Phased, low-disruption execution

Senior Living

Built for a vulnerable population.

Community transitions and resident relocations that protect residents and preserve occupancy throughout the project.

  • Resident relocations & community transitions
  • Occupancy preservation
  • Full-service, supervised handling

Corporate Real Estate

Coordinated across sites and stakeholders.

Workplace transformations, office relocations, and FF&E programs, coordinated across multiple sites and stakeholders under one point of accountability.

  • Office & HQ relocations
  • FF&E programs
  • Multi-site / campus coordination
Coverage

Statewide capacity.
Vertical-specific depth.

Our four core verticals carry most of our enterprise volume. We also bring crews, supervisors, and storage-program support to a range of adjacent industries, each with a defined playbook.

Don’t see your work above? Confirm scope fit on a consultation. Tell us about your project →

Review case studies
Performance

Operational data.
Not testimonials.

The metrics we publish are the ones our partners measure us on: schedule adherence, claims rate, and audit-ready closeout. We report against internal SLAs on every engagement.

They didn’t pitch us moving. They showed us a system that locked into our construction schedule. We stopped chasing vendors and started running phase ahead of plan.

Director of Asset Management
Mixed-income housing portfolio · Houston, TX
Operating
40yrs

Texas-based relocation since 1985, family operated.

Claims rate
0.4%

Damage incidents per move, against an industry mean of 4–6%.

On-time
98%

Of supervisor-led projects close on or ahead of schedule.

Scope of engagement

A single, accountable
relocation program.

Enterprise engagements include the full operational stack: supervision, storage, visibility, compliance documentation, and partner paperwork, all under one statement of work and one point of accountability.

SLE
Supervisor-led execution

On-site lead, every job. Single point of accountability.

TT
TurnTrack™ visibility

Unit-level status, photos, timestamps, audit-ready closeout.

PS
3MM Portable Storage

Storage on Demand, crew and supervision included.

2x
Two-touch handling

Loaded once. Stored. Returned once. Less damage, less risk.

C
Compliance ready

LIHTC, RAD, HUD, URA documentation; audit-ready records.

M
MSA + preferred-vendor

Master service agreements, RFPs, and onboarding paperwork.

FAQ

Common questions
from project teams.

Direct answers to questions construction managers, asset managers, and ops teams typically raise during initial diligence.

Q · 01

Traditional movers are built for one-off moves. Perfect Move by Design™ is a five-phase commercial relocation program (Plan, Execute, Store, Return, Report) run against your construction schedule. Supervisor-led, with in-house crews, secure storage, and unit-level tracking, so relocation supports the project instead of disrupting it.

Q · 02

It starts in Plan: we sequence every move against your build, set the communication and escalation plan, and assign a single point of contact before the first box moves. On site, a dedicated supervisor owns coordination and resident communication, so your property and construction teams aren’t absorbing it.

Q · 03

Report is a built-in phase. TurnTrack™ gives unit-level status, photos, and timestamps in real time, with closeout documentation that’s ready for audit. Leadership can see progress without chasing updates, and compliance records are there when you need them.

Q · 04

Yes. The same five-phase framework and supervisor-led standard run across multi-site, multi-phase portfolios under one statement of work and one point of accountability, whether it’s one community or a statewide program.

Q · 05

Execution and documentation are aligned with LIHTC, RAD, HUD, and URA requirements, with chain-of-custody on stored assets and closeout records ready for review. Compliance fit is confirmed during Plan, before any work is scheduled.

Q · 06

We operate statewide with crews and supervisors based in Houston, Dallas, San Antonio, and Austin. The same five-phase framework and supervisor-led standard runs consistently across all four markets, so multi-site programs execute under one plan regardless of location.

Q · 07

With a Project Velocity Walkthrough™, a short conversation to understand your scope, sequencing, and compliance requirements. We confirm fit before scheduling anything further. The goal is to understand your project, not to pitch.

Engagement

Book a
Project Velocity Walkthrough.

We review your scope, sequencing, and compliance requirements before anything is scheduled, confirming whether our program is the right fit before either side commits time.

Or call directly · Enterprise line
(346) 585-7430
Monday – Friday, 7am – 7pm CT · One transfer, never a queue.
Mitch Gonzalez · Director, Commercial & Enterprise Services
Owns every enterprise inquiry. 3 Men Movers since 2014.

Tell us about your project

Initial consultation. We review scope, sequencing, and compliance fit before scheduling anything further.

Required
Required
Required
Required

Or call our enterprise line: (346) 585-7430