Transparent Pricing - No hidden Fees
Enterprise · Case studies

Real projects.
Real systems at work.

Browse by industry, service, or region. Every project below was run on Perfect Move by Design™ — supervisor-led, scheduled against the build plan, documented through closeout.

Active case studies
8
Industries covered
10
Texas metros
6
Avg. on-time rate
98%
Industry
Service
Region
Showing 8 of 8
Mid-rise LIHTC renovation, 184 units kept in placeAffordable HousingHouston
Tenant-in-Place RelocationsFurniture & Asset Storage

Mid-rise LIHTC renovation, 184 units kept in place

Coordinated a 14-month tenant-in-place renovation across 184 occupied units. Residents moved twice — once into hospitality units, once back home — without losing a day of program compliance.

Units relocated
184
URA findings
0
Days early
11
Hettig / Kahn Holdings
Read case study
Hurricane response: 340-unit pack-out and returnInsurance & RestorationGulf Coast
Pack-Out & RestorationLong-Term Warehousing

Hurricane response: 340-unit pack-out and return

Mobilized within 24 hours of flooding event. Climate-controlled storage of 340 displaced units with full chain-of-custody documentation through return.

Major Texas restoration firm
Read case study
Hospital floor consolidation, zero patient impactHealthcareAustin
IT & Lab Equipment MovesOffice Moves

Hospital floor consolidation, zero patient impact

Off-hours relocation of three clinical floors. IT and sensitive equipment moved on schedule between Friday close and Monday open, with on-site supervision throughout.

Central Texas medical center
Read case study
Tech HQ consolidation across two buildingsCorporate OfficesAustin
Office MovesFF&E Installation

Tech HQ consolidation across two buildings

Consolidated 480 workstations across two buildings into a new HQ. Phased over four weekends with a hoteling reset; teams logged in Monday with full setups.

Confidential — SaaS company
Read case study
Grand opening: 220-resident move-in over 21 daysSenior LivingDallas–Fort Worth
FF&E InstallationEmployee Relocations

Grand opening: 220-resident move-in over 21 days

FF&E install, resident-by-resident move-ins, and family-day coordination. Concierge protocol on every unit — same supervisor from intake through unpack.

National senior living operator
Read case study
8-property RAD repositioning across two metrosAffordable HousingDallas / Houston
Tenant-in-Place RelocationsRecords Management

8-property RAD repositioning across two metros

Portfolio-level relocation program across eight assets. Standardized resident communications, single TurnTrack instance, one accountable PM across both metros.

McCormack Baron Salazar (composite)
Read case study
Hotel reflag: full FF&E swap in 9 dark daysHospitalitySan Antonio
FF&E InstallationSite Closures & Liquidation

Hotel reflag: full FF&E swap in 9 dark days

Full brand conversion across 186 keys. Old FF&E liquidated and donated, new package received and installed under one workflow before re-open.

Independent ownership group
Read case study
Residence hall summer turn: 4,200 beds in 6 weeksStudent HousingAustin
Office Moves3MM Portable Storage

Residence hall summer turn: 4,200 beds in 6 weeks

Annual summer turn including storage cycle for international students, room rekey support, and FF&E refresh in 12 buildings — completed before fall move-in.

Major Texas public university
Read case study
Don’t see your industry?

We probably do it.
Let’s confirm in 15 minutes.

Our public case library is a fraction of the work. Many enterprise engagements run under NDA — we can share comparable scopes confidentially on a clarity call.